Quarterly update of remuneration for electrical installations with fuel-dependent costs (Q3 2026)
04 Jul 2026Effective: 01 Jul 2026117 views
Who is affected:
Holders of renewable electrical installations, cogeneration and waste with specific remuneration regime
Summary
Remuneration values for operation in the third quarter of 2026 are updated for renewable electrical installations, cogeneration and waste whose costs depend on fuel prices.
Detailed analysis
PRO
The State Secretariat for Energy updates quarterly the remuneration for operation (Ro) values for standard electrical generation installations with specific remuneration regime whose costs depend essentially on fuel. The revision applies from 1 July 2026 and follows the methodology established in Orden TED/526/2024, wh…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 2 de julio de 2026, de la Secretaría de Estado de Energía, por la que se actualizan los valores de la retribución a la operación correspondientes al tercer trimestre natural del año 2026 de las instalaciones tipo de generación de energía eléctrica cuyos costes de explotación dependan esencialmente del precio del combustible.
Material errors are corrected in the resolution that accepted Acciona's withdrawal to build a 50.98 MW solar plant in Ayora (Valencia). The change affects only ...
Corporación Acciona Eólica, SL and state energy administration
Material errors are corrected in the resolution that accepted Acciona's withdrawal to build a 41.99 MWp solar plant in Ayora (Valencia). The file is archived wi...
Corporación Acciona Eólica, SL, and administrations involved in the energy file
Material errors are corrected in the resolution that accepted Acciona's withdrawal to build a 43 MWp photovoltaic plant in Ayora (Valencia). The change affects ...
Corporación Acciona Eólica, SL and state energy administration
The auction procedure is regulated so that high-efficiency cogeneration facilities obtain economic aid from the State. It affects industrial plants that produce...
Material errors are corrected in the resolution that accepted Acciona's withdrawal from building a 45 MW photovoltaic plant in Ayora (Valencia). The correction ...
Corporación Acciona Eólica, SL, and the Dirección General de Política Energética y Minas
Oropesa Solar is authorized to add a 22.26 MW battery system to its existing photovoltaic plant in Talayuela, creating a hybrid installation with 66.81 MW total...
Oropesa Solar SL and renewable energy sector in Extremadura