Energy BOE Importance: 2/10

Correction of errors in the resolution on the abandonment of Acciona's 'Rincón del Cabello' photovoltaic park in Valencia

03 Jul 2026 Effective: 03 Jul 2026 5 views
Who is affected:
Corporación Acciona Eólica, SL, and the Dirección General de Política Energética y Minas

Summary

Material errors are corrected in the resolution that accepted Acciona's withdrawal from building a 45 MW photovoltaic plant in Ayora (Valencia). The correction affects formal aspects of the text without changing the substance of the decision.

Detailed analysis PRO

This resolution rectifies purely formal errors detected in the resolution of 27 April 2026, by which the withdrawal of Corporación Acciona Eólica, SL, was accepted with respect to its hybrid photovoltaic project 'Rincón del Cabello' of 45.25 MWp in Ayora (Valencia). The correction is based on article 109 of Ley 39/2015…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 19 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 27 de abril de 2026, por la que se acepta el desistimiento formulado por Corporación Acciona Eólica, SL, de la solicitud de autorización administrativa previa, autorización administrativa de construcción, declaración de impacto ambiental y declaración en concreto de utilidad pública de la infraestructura híbrida fotovoltaica «Rincón del Cabello», de 45,25 MWp, y su infraestructura de evacuación, en Ayora (Valencia).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations