Energy BOE Importance: 3/10

Authorization to add 22 MW battery storage system to solar plant in Talayuela (Cáceres)

01 Jul 2026 Effective: 01 Jul 2026 18 views
Who is affected:
Oropesa Solar SL and renewable energy sector in Extremadura

Summary

Oropesa Solar is authorized to add a 22.26 MW battery system to its existing photovoltaic plant in Talayuela, creating a hybrid installation with 66.81 MW total capacity.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Oropesa Solar, SL prior authorization and construction permit for the BESS Talayuela II storage module of 22.26 MW, which will be hybridized with the existing photovoltaic plant of 44.55 MW. The resulting installation will have 66.81 MW of total power and will …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 17 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Oropesa Solar, SL, autorización administrativa previa y autorización administrativa de construcción para el módulo de almacenamiento «Talayuela II BESS», de 22,26 MW de potencia instalada, y parte de su infraestructura de evacuación, para su hibridación con la planta fotovoltaica existente, «PSFV Talayuela II», de 44,55 MW de potencia instalada, conformando una instalación hibrida de 66,81 MW de potencia instalada, en Talayuela (Cáceres).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations