Correction of errors in the resolution on the abandonment of Acciona's 'La Solana' photovoltaic solar project in Valencia
04 Jul 2026Effective: 04 Jul 202675 views
Who is affected:
Corporación Acciona Eólica, SL and state energy administration
Summary
Material errors are corrected in the resolution that accepted Acciona's withdrawal to build a 50.98 MW solar plant in Ayora (Valencia). The change affects only the formal wording of the document, without altering the substance of the decision.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines rectifies drafting errors detected in the resolution of 27 April 2026, by which the withdrawal of Corporación Acciona Eólica, SL was accepted regarding the hybrid photovoltaic project 'La Solana' of 50.98 MWp in Ayora (Valencia). The correction affects sections Four a…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 19 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 27 de abril de 2026, por la que se acepta el desistimiento formulado por Corporación Acciona Eólica, SL, de la solicitud de autorización administrativa previa, autorización administrativa de construcción, declaración de impacto ambiental y declaración en concreto de utilidad pública de la infraestructura híbrida fotovoltaica «La Solana», de 50,98 MWp, y su infraestructura de evacuación, en Ayora (Valencia).
The remuneration values for operation in the fourth quarter of 2026 are updated for renewable electrical installations, cogeneration and waste whose costs depen...
Holders of renewable, cogeneration and waste installations with specific remuneration regime
Navarre extends the suspension of new biomethane plant projects managing external waste until December 31, 2028, while developing specific regulations.
Biomethane plant developers in Navarre and Navarrese agri-livestock sector
The CNMC approves the final review of gas losses (shrinkage) in plants, transport and distribution networks for the 2024 gas year, adjusting the remuneration of...
Holders of regasification plants, natural gas transport and distribution networks
The CNMC calculates the additional costs recognized to REE as the electricity system operator in 2025. The resulting balance will be incorporated into the follo...
Red Eléctrica de España (REE) as the electricity system operator and electricity market agents
The EU Council approves the European position to modify gas transport tariff rules in the EEA. It affects how tolls on gas networks are calculated and harmonize...
Gas transport network operators and traders in the EEA