Energy BOE Importance: 2/10

Correction of errors in the resolution on the abandonment of the Bodeguillas photovoltaic solar project by Acciona in Valencia

06 Jul 2026 Effective: 06 Jul 2026 59 views
Who is affected:
Corporación Acciona Eólica, SL, and administrations involved in the energy file

Summary

Material errors are corrected in the resolution that accepted Acciona's withdrawal to build a 41.99 MWp solar plant in Ayora (Valencia). The file is archived without substantial changes.

Detailed analysis PRO

The General Directorate of Energy Policy and Mines rectifies a formatting error in the resolution of 27 April 2026 that archived file PEol-FV-137 following the withdrawal of Corporación Acciona Eólica, SL. The error consisted of a paragraph from section four on economic guarantees appearing outside its correct location…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 19 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 27 de abril de 2026, por la que se acepta el desistimiento formulado por Corporación Acciona Eólica, SL, de la solicitud de autorización administrativa previa, autorización administrativa de construcción, declaración de impacto ambiental y declaración en concreto de utilidad pública de la infraestructura híbrida fotovoltaica «Bodeguillas», de 41,99 MWp, y su infraestructura de evacuación, en Ayora (Valencia).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations