Amendment of authorization for Alce Electrik voltage measurement transformer for use in electrical grid
01 May 2026Effective: 01 Apr 202676 views
Who is affected:
Alce Electrik manufacturer and electrical sector companies that install this transformer
Summary
The authorization of a high voltage measurement transformer manufactured by Alce Electrik for use in the Spanish electrical grid is amended.
Detailed analysis
PRO
The General Secretariat for Industry and Energy Development amends the authorization of the Alce Electrik model 4MR12 variant F, a high voltage measurement transformer intended for installation in the grid. This resolution updates the technical conditions under which this equipment may operate in the Spanish electrical…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 1 de abril de 2026, de la Secretaría General de Industria y Desarrollo Energético, de la Consejería de Economía e Industria, por la que se modifica la autorización del modelo para su uso e instalación en la red de un transformador de medida de tensión, en alta tensión, fabricado por Alce Electrik, modelo 4MR12, variante F.
Planta Solar OPDE 25 is authorized to build a 43.9 MW battery storage system alongside its Covatillas 3 photovoltaic park in Castillejo de Iniesta (Cuenca). The...
Promoting company Planta Solar OPDE 25 SL and renewable energy sector in Cuenca
Arena Power Solar 33 renounces construction of a 54 MW solar plant in Beas and Trigueros (Huelva) due to incompatibility with the future Seville-Huelva high-spe...
Promoter company Arena Power Solar 33 SLU and municipalities of Beas and Trigueros (Huelva)
Arena Power Solar 35 renounces construction of a 57.5 MW solar plant in Huelva as it interferes with the future Seville-Huelva high-speed rail route. The Direct...
Renewable energy developers and photovoltaic sector companies in Huelva
Savanna Power Solar 9 withdraws from building a 59 MW solar plant in Huelva due to incompatibility with the future AVE Sevilla-Huelva. The Ministry accepts the ...
Renewable energy developers and photovoltaic sector in Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...