Energy BOE Importance: 3/10

Authorization of 45 MW photovoltaic solar plant and 5 MW storage in Fuendejalón (Zaragoza) for hybridization with wind farm

27 Apr 2026 Effective: 14 Apr 2026 42 views
Who is affected:
Molinos del Moncayo SL company and renewable energy sector in Aragón

Summary

Molinos del Moncayo SL is authorized to build a 45 MW solar plant with 5 MW battery storage in Zaragoza, which will be combined with an existing 46 MW wind farm.

Detailed analysis PRO

The Dirección General de Política Energética y Minas grants prior administrative authorization to Molinos del Moncayo SL to construct the Las Azubías photovoltaic solar facility of 45 MW and a battery energy storage system of 5 MW in Fuendejalón, Zaragoza. The installation will be hybridized with the existing Las Azubí…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 14 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Molinos del Moncayo, SL, autorización administrativa previa para el módulo solar fotovoltaico «Central solar fotovoltaica Las Azubías», de 45 MW de potencia instalada y para el módulo de almacenamiento con baterías «Almacenamiento hibridación Las Azubías», de 5 MW de potencia instalada, y su infraestructura de evacuación, en Fuendejalón (Zaragoza), para su hibridación con el parque eólico existente «Las Azubías», de 46 MW.

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations