Energy BOE Importance: 3/10

Authorization of 45 MW photovoltaic solar plant and 5 MW storage in Fuendejalón (Zaragoza) for hybridization with wind farm

27 Apr 2026 Effective: 14 Apr 2026 24 views
Who is affected:
Molinos del Moncayo SL company and renewable energy sector in Aragón

Summary

Molinos del Moncayo SL is authorized to build a 45 MW solar plant with 5 MW battery storage in Zaragoza, which will be combined with an existing 46 MW wind farm.

Detailed analysis PRO

The Dirección General de Política Energética y Minas grants prior administrative authorization to Molinos del Moncayo SL to construct the Las Azubías photovoltaic solar facility of 45 MW and a battery energy storage system of 5 MW in Fuendejalón, Zaragoza. The installation will be hybridized with the existing Las Azubí…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 14 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Molinos del Moncayo, SL, autorización administrativa previa para el módulo solar fotovoltaico «Central solar fotovoltaica Las Azubías», de 45 MW de potencia instalada y para el módulo de almacenamiento con baterías «Almacenamiento hibridación Las Azubías», de 5 MW de potencia instalada, y su infraestructura de evacuación, en Fuendejalón (Zaragoza), para su hibridación con el parque eólico existente «Las Azubías», de 46 MW.