Amendment of authorization for high voltage current measurement transformer by Alce Electrik
01 May 2026Effective: 01 Apr 202680 views
Who is affected:
Manufacturers, installers and electrical grid operators using the Alce Electrik model 4MA72
Summary
The authorization of a high voltage current measurement transformer manufactured by Alce Electrik for use in the electrical grid is amended. Affects model 4MA72, Size 4 variant.
Detailed analysis
PRO
The General Secretariat of Industry and Energy Development of the Ministry of Economy and Industry amends the authorization of the high voltage current measurement transformer model manufactured by Alce Electrik, model 4MA72, Size 4 variant. This amendment permits its installation and use in the electrical grid under t…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 1 de abril de 2026, de la Secretaría General de Industria y Desarrollo Energético, de la Consejería de Economía e Industria, por la que se modifica la autorización del modelo para su uso e instalación en la red de un transformador de medida de intensidad, en alta tensión, fabricado por Alce Electrik, modelo 4MA72, variante Size 4.
La empresa Savanna Power Solar 9 renuncia a construir una planta solar de 59 MW en Huelva por incompatibilidad con el futuro AVE Sevilla-Huelva. El Ministerio a...
Promotores de energías renovables y sector fotovoltaico en Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection