The EU allows the use of fluorinated gases in certain indoor heat pump models
11 Nov 2026Effective: 10 Nov 20260 views
Who is affected:
Manufacturers, importers and distributors of indoor monoblock heat pumps in the EU
Summary
The European Commission authorizes an exemption to use fluorinated greenhouse gases in monoblock heat pumps installed indoors. This exemption is temporary and applies to specific market models.
Detailed analysis
PRO
Implementation Regulation (EU) 2026/2486 grants an exemption to Regulation (EU) 2024/573 on fluorinated greenhouse gases (F-gases), allowing their commercialization in certain types of indoor monoblock heat pumps. This exception responds to the lack of viable technical alternatives with refrigerants of low global warmi…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
OJ:L_202602486: Reglamento de Ejecución (UE) 2026/2486 de la Comisión, de 10 de noviembre de 2026, por el que se autoriza una exención con arreglo al Reglamento (UE) 2024/573 del Parlamento Europeo y del Consejo en lo que respecta a la introducción en el mercado de gases fluorados de efecto invernadero en determinados tipos de bombas de calor monobloque instaladas en interiores
The official catalog of energy saving measures is expanded with a new form to replace combustion vehicles with electric vehicles acquired through leasing. Requi...
Companies, self-employed workers and entities requesting Energy Saving Certificates (CAE)
This regulates how to award 935 MW of electricity capacity released at the Mudéjar node following the reduction of the awarded renewable project, in the area af...
Renewable energy and storage developers applying for access to the Mudéjar 400 kV node
Authorization is granted to build a 30 MW battery system alongside the OPDE Trévago 1 solar plant in Soria to store renewable energy. The project was processed ...
Promoting company OPDE 42, SLU and municipalities of Fuentestrún, Trévago and Matalebreras (Soria)
A 27.3 MW photovoltaic installation is authorized in Padiernos and Niharra (Ávila) to be combined with an already operational wind farm of 29.6 MW. The project ...
Promoter company Eólica Sierra de Ávila SL and municipalities of Padiernos and Niharra (Ávila)
The Government authorizes Solaria to build a 48.5 MW battery storage system in Valluércanes (Burgos) to store energy from its existing 115 MW solar plant.
Solaria Promoción y Desarrollo Fotovoltaico, SLU, and municipalities of Valluércanes and surrounding areas in Burgos
Solaria is authorized to build a 48.5 MW battery storage system in La Vid de Bureba (Burgos) to store energy from its 140 MW solar plant. The installation will ...
Solaria Promoción y Desarrollo Fotovoltaico and municipalities of La Vid de Bureba and surrounding areas in Burgos