Energy BOE Importance: 3/10

Authorization for 48.5 MW battery storage system by Solaria in Burgos

09 Nov 2026 Effective: 09 Nov 2026 0 views
Who is affected:
Solaria Promoción y Desarrollo Fotovoltaico and municipalities of La Vid de Bureba and surrounding areas in Burgos

Summary

Solaria is authorized to build a 48.5 MW battery storage system in La Vid de Bureba (Burgos) to store energy from its 140 MW solar plant. The installation will improve the management of renewable energy generated.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Solaria Promoción y Desarrollo Fotovoltaico prior and construction authorization for a 48.50 MW battery storage module in La Vid de Bureba (Burgos), to be hybridized with its already authorized 140.127 MW photovoltaic plant. The evacuation infrastructure includ…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 22 de octubre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Solaria Promoción y Desarrollo Fotovoltaico, SLU, autorización administrativa previa y autorización administrativa de construcción para el módulo de almacenamiento de energía por baterías «Agrupación Maira Beta», de 48,50 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la instalación solar fotovoltaica «Agrupación Maira Beta», de 140,127 MW de potencia instalada, ubicada en La Vid de Bureba (Burgos).

Related regulations

Almost there