Update of energy efficiency measures catalog: new form for electric vehicles in leasing
11 Nov 2026Effective: 11 Nov 20260 views
Who is affected:
Companies, self-employed workers and entities requesting Energy Saving Certificates (CAE)
Summary
The official catalog of energy saving measures is expanded with a new form to replace combustion vehicles with electric vehicles acquired through leasing. Requirements are also made more flexible in forms for boilers and heat pumps.
Detailed analysis
PRO
The resolution updates the catalog of standardized energy efficiency measures (CAE) incorporating form TRA050.R, which allows obtaining Energy Saving Certificates when replacing combustion vehicles with pure electric vehicles through leasing of minimum 4 years, requiring the incentive to be shared between the investing…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 4 de noviembre de 2026, de la Dirección General de Planificación y Coordinación Energética, por la que se actualiza el anexo I de la Orden TED/845/2023, de 18 de julio, por la que se aprueba el catálogo de medidas estandarizadas de eficiencia energética.
This regulates how to award 935 MW of electricity capacity released at the Mudéjar node following the reduction of the awarded renewable project, in the area af...
Renewable energy and storage developers applying for access to the Mudéjar 400 kV node
The European Commission authorizes an exemption to use fluorinated greenhouse gases in monoblock heat pumps installed indoors. This exemption is temporary and a...
Manufacturers, importers and distributors of indoor monoblock heat pumps in the EU
Authorization is granted to build a 30 MW battery system alongside the OPDE Trévago 1 solar plant in Soria to store renewable energy. The project was processed ...
Promoting company OPDE 42, SLU and municipalities of Fuentestrún, Trévago and Matalebreras (Soria)
A 27.3 MW photovoltaic installation is authorized in Padiernos and Niharra (Ávila) to be combined with an already operational wind farm of 29.6 MW. The project ...
Promoter company Eólica Sierra de Ávila SL and municipalities of Padiernos and Niharra (Ávila)
The Government authorizes Solaria to build a 48.5 MW battery storage system in Valluércanes (Burgos) to store energy from its existing 115 MW solar plant.
Solaria Promoción y Desarrollo Fotovoltaico, SLU, and municipalities of Valluércanes and surrounding areas in Burgos
Solaria is authorized to build a 48.5 MW battery storage system in La Vid de Bureba (Burgos) to store energy from its 140 MW solar plant. The installation will ...
Solaria Promoción y Desarrollo Fotovoltaico and municipalities of La Vid de Bureba and surrounding areas in Burgos