Tender for allocation of 935 MW of renewable electricity capacity at Mudéjar 400 kV node (Teruel)
11 Nov 2026Effective: 11 Nov 20261 views
Who is affected:
Renewable energy and storage developers applying for access to the Mudéjar 400 kV node
Summary
This regulates how to award 935 MW of electricity capacity released at the Mudéjar node following the reduction of the awarded renewable project, in the area affected by the closure of the Andorra thermal power plant (Teruel).
Detailed analysis
PRO
Orden TED/1197/2026 establishes the procedure to grant up to 935.1 MW of evacuation access capacity at the Mudéjar 400 kV node, released following the environmental modification of the Enel Green Power España project. Available capacity is divided between synchronous generation modules and electric park modules, both w…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Orden TED/1197/2026, de 5 de noviembre, por la que se regula el procedimiento y requisitos aplicables para la concesión de la capacidad de acceso de evacuación a la red de transporte de energía eléctrica disponible en el nudo de transición justa Mudéjar 400 KV como consecuencia de las modificaciones previstas en la base 23 de la Orden TED/1182/2021, de 2 de noviembre.
The official catalog of energy saving measures is expanded with a new form to replace combustion vehicles with electric vehicles acquired through leasing. Requi...
Companies, self-employed workers and entities requesting Energy Saving Certificates (CAE)
The European Commission authorizes an exemption to use fluorinated greenhouse gases in monoblock heat pumps installed indoors. This exemption is temporary and a...
Manufacturers, importers and distributors of indoor monoblock heat pumps in the EU
Authorization is granted to build a 30 MW battery system alongside the OPDE Trévago 1 solar plant in Soria to store renewable energy. The project was processed ...
Promoting company OPDE 42, SLU and municipalities of Fuentestrún, Trévago and Matalebreras (Soria)
A 27.3 MW photovoltaic installation is authorized in Padiernos and Niharra (Ávila) to be combined with an already operational wind farm of 29.6 MW. The project ...
Promoter company Eólica Sierra de Ávila SL and municipalities of Padiernos and Niharra (Ávila)
The Government authorizes Solaria to build a 48.5 MW battery storage system in Valluércanes (Burgos) to store energy from its existing 115 MW solar plant.
Solaria Promoción y Desarrollo Fotovoltaico, SLU, and municipalities of Valluércanes and surrounding areas in Burgos
Solaria is authorized to build a 48.5 MW battery storage system in La Vid de Bureba (Burgos) to store energy from its 140 MW solar plant. The installation will ...
Solaria Promoción y Desarrollo Fotovoltaico and municipalities of La Vid de Bureba and surrounding areas in Burgos