Energy BOE Importance: 6/10

Tender for allocation of 935 MW of renewable electricity capacity at Mudéjar 400 kV node (Teruel)

11 Nov 2026 Effective: 11 Nov 2026 1 views
Who is affected:
Renewable energy and storage developers applying for access to the Mudéjar 400 kV node

Summary

This regulates how to award 935 MW of electricity capacity released at the Mudéjar node following the reduction of the awarded renewable project, in the area affected by the closure of the Andorra thermal power plant (Teruel).

Detailed analysis PRO

Orden TED/1197/2026 establishes the procedure to grant up to 935.1 MW of evacuation access capacity at the Mudéjar 400 kV node, released following the environmental modification of the Enel Green Power España project. Available capacity is divided between synchronous generation modules and electric park modules, both w…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Orden TED/1197/2026, de 5 de noviembre, por la que se regula el procedimiento y requisitos aplicables para la concesión de la capacidad de acceso de evacuación a la red de transporte de energía eléctrica disponible en el nudo de transición justa Mudéjar 400 KV como consecuencia de las modificaciones previstas en la base 23 de la Orden TED/1182/2021, de 2 de noviembre.