Construction of 'ISF A Gudiña Solar' 60 MW solar park in Ourense denied due to permit expiration

27 Jun 2026 Effective: 27 Jun 2026 1 views
Who is affected:
Amber Solar Power Veintinueve, SL and renewable energy developers with projects under processing

Summary

The Ministry denies Amber Solar Power authorization to build a 60.72 MW photovoltaic park in Ourense. Network access permits expired in December 2024 as construction authorization was not obtained in time.

Detailed analysis PRO

The General Directorate of Energy Policy and Mines dismisses the application by Amber Solar Power Veintinueve, SL to construct the 'ISF A Gudiña Solar' photovoltaic park of 60.72 MW in Ourense province. The main reason is the expiration of access and connection permits to the transmission network on 18 December 2024, a…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 12 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Amber Solar Power Veintinueve, SL, de autorización administrativa previa y autorización administrativa de construcción del parque fotovoltaico «ISF A Gudiña Solar», de 60,72 MW de potencia instalada, y de su infraestructura de evacuación, y de declaración, en concreto, de utilidad pública de parte de su infraestructura de evacuación, en la provincia de Orense.