Expansion of El Secarral 93 MW solar plant in Alicante denied due to permit expiration and lack of environmental assessment
27 Jun 2026Effective: 27 Jun 2026101 views
Who is affected:
Lavanda Desarrollos España, SL, developer of the El Secarral photovoltaic project in Alicante
Summary
The Directorate General for Energy Policy denies Lavanda Desarrollos España the modification of its 93 MW solar plant in Alicante. Connection permits expired and the project required new environmental impact assessment.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines rejects the request from Lavanda Desarrollos España, SL, to modify the authorizations for the El Secarral photovoltaic project (93 MW) in Alicante. The proposed modifications to the 30 kV and 220 kV evacuation line routes significantly departed from those evaluated in…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 9 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Lavanda Desarrollos España, SL, de modificación de autorización administrativa previa, autorización administrativa de construcción y declaración, en concreto, de utilidad pública del proyecto de instalación fotovoltaica El Secarral, de 93 MW de potencia instalada, y su infraestructura de evacuación, en la provincia de Alicante.
The Ministry denies Amber Solar Power authorization to build a 60.72 MW photovoltaic park in Ourense. Network access permits expired in December 2024 as constru...
Amber Solar Power Veintinueve, SL and renewable energy developers with projects under processing
The Ministry denies Trébol Desarrollos Fotovoltaicos España authorization to build a 7 MW solar park in Méntrida (Toledo) due to unfavorable environmental impac...
Promoters of photovoltaic solar parks, especially Trébol Desarrollos Fotovoltaicos España SL
Arena Green Power 20 withdraws its application to build a 50 MW wind farm in Asturias. The project is archived after failing to obtain the environmental impact ...
Developers of wind farms and renewable energy projects in Spain
The Government authorizes Repsol to expand the reversible hydroelectric power plant at Aguayo in Cantabria, with a turbining capacity of 1,014 MW. The facility ...
Repsol Generación Eléctrica, municipalities of San Miguel de Aguayo, Bárcena de Pie de Concha and Molledo (Cantabria)
The entry into force of the international agreement reforming the Energy Charter Treaty, a key framework for investments in the energy sector, is announced.
Investors and companies in the energy sector with international operations in signatory countries