Expansion of El Secarral 93 MW solar plant in Alicante denied due to permit expiration and lack of environmental assessment
27 Jun 2026
Effective: 27 Jun 2026
2 views
Who is affected:
Lavanda Desarrollos España, SL, developer of the El Secarral photovoltaic project in Alicante
Summary
The Directorate General for Energy Policy denies Lavanda Desarrollos España the modification of its 93 MW solar plant in Alicante. Connection permits expired and the project required new environmental impact assessment.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines rejects the request from Lavanda Desarrollos España, SL, to modify the authorizations for the El Secarral photovoltaic project (93 MW) in Alicante. The proposed modifications to the 30 kV and 220 kV evacuation line routes significantly departed from those evaluated in…
Full official title
Resolución de 9 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Lavanda Desarrollos España, SL, de modificación de autorización administrativa previa, autorización administrativa de construcción y declaración, en concreto, de utilidad pública del proyecto de instalación fotovoltaica El Secarral, de 93 MW de potencia instalada, y su infraestructura de evacuación, en la provincia de Alicante.