CNMC approves the procedure for autonomous start-up service of the electrical system
27 Jun 2026Effective: 27 Jun 2026118 views
Who is affected:
Electrical generators with autonomous start-up capacity and system operator Red Eléctrica
Summary
The CNMC regulates how the autonomous start-up service of the Spanish electrical network works, which allows restoring supply after a blackout without depending on the grid. It establishes technical requirements, remuneration and financing for service providers.
Detailed analysis
PRO
The CNMC approves Operating Procedure 7.6 that regulates the autonomous start-up service (black start) of the Spanish peninsular electrical system. This service allows restarting the electrical grid after a widespread failure without requiring external power supply. The procedure defines two allocation phases: an initi…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 19 de junio de 2026, de la Comisión Nacional de los Mercados y la Competencia, por la que se aprueba el procedimiento de operación eléctrico 7.6 para el servicio de arranque autónomo.
The CNMC updates electrical procedures P.O.9.2 and P.O.14.4 to enable economic settlement of sanctions against installations that fail to send real-time informa...
Producers, generators, consumers and peninsular electrical network managers with telemetry obligations
The EU updates the parameters that determine how many free emission allowances industries receive for the 2026-2030 period. It affects energy-intensive industri...
Industrial installations included in the EU ETS: steel, cement, refining, chemicals, paper and other energy-intensive sectors
The Ministry denies authorization for the Benavieja wind farm in Cantabria following an unfavorable environmental impact assessment and expiration of grid conne...
Wind farm promoters and renewable energy projects in Spain
Arena Green Power 20 withdraws its application to build a 50 MW wind farm in Asturias. The project is archived after failing to obtain the environmental impact ...
Developers of wind farms and renewable energy projects in Spain
The Ministry denies Trébol Desarrollos Fotovoltaicos España authorization to build a 7 MW solar park in Méntrida (Toledo) due to unfavorable environmental impac...
Promoters of photovoltaic solar parks, especially Trébol Desarrollos Fotovoltaicos España SL
The Ministry denies Amber Solar Power authorization to build a 60.72 MW photovoltaic park in Ourense. Network access permits expired in December 2024 as constru...
Amber Solar Power Veintinueve, SL and renewable energy developers with projects under processing