Authorization Denied for La Ladera 7 MW Solar Photovoltaic Park in Toledo
27 Jun 2026
Effective: 27 Jun 2026
1 views
Who is affected:
Promoters of photovoltaic solar parks, especially Trébol Desarrollos Fotovoltaicos España SL
Summary
The Ministry denies Trébol Desarrollos Fotovoltaicos España authorization to build a 7 MW solar park in Méntrida (Toledo) due to unfavorable environmental impact and expiration of connection permits.
Detailed analysis
PRO
The Directorate General of Energy Policy and Mines dismisses the request for prior administrative authorization of the La Ladera solar photovoltaic park (7 MW) in Méntrida, Toledo. The main reasons are the unfavorable environmental impact declaration issued in January 2023 by the Directorate General of Quality and Envi…
Full official title
Resolución de 12 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Trébol Desarrollos Fotovoltaicos España, SL, de autorización administrativa previa del parque solar fotovoltaico La Ladera, de 7 MW de potencia instalada, y de su infraestructura de evacuación, en la provincia de Toledo.