Authorization Denied for La Ladera 7 MW Solar Photovoltaic Park in Toledo
27 Jun 2026Effective: 27 Jun 202696 views
Who is affected:
Promoters of photovoltaic solar parks, especially Trébol Desarrollos Fotovoltaicos España SL
Summary
The Ministry denies Trébol Desarrollos Fotovoltaicos España authorization to build a 7 MW solar park in Méntrida (Toledo) due to unfavorable environmental impact and expiration of connection permits.
Detailed analysis
PRO
The Directorate General of Energy Policy and Mines dismisses the request for prior administrative authorization of the La Ladera solar photovoltaic park (7 MW) in Méntrida, Toledo. The main reasons are the unfavorable environmental impact declaration issued in January 2023 by the Directorate General of Quality and Envi…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 12 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Trébol Desarrollos Fotovoltaicos España, SL, de autorización administrativa previa del parque solar fotovoltaico La Ladera, de 7 MW de potencia instalada, y de su infraestructura de evacuación, en la provincia de Toledo.
Arena Green Power 20 withdraws its application to build a 50 MW wind farm in Asturias. The project is archived after failing to obtain the environmental impact ...
Developers of wind farms and renewable energy projects in Spain
The CNMC regulates how the autonomous start-up service of the Spanish electrical network works, which allows restoring supply after a blackout without depending...
Electrical generators with autonomous start-up capacity and system operator Red Eléctrica
The CNMC updates electrical procedures P.O.9.2 and P.O.14.4 to enable economic settlement of sanctions against installations that fail to send real-time informa...
Producers, generators, consumers and peninsular electrical network managers with telemetry obligations
The Ministry denies Amber Solar Power authorization to build a 60.72 MW photovoltaic park in Ourense. Network access permits expired in December 2024 as constru...
Amber Solar Power Veintinueve, SL and renewable energy developers with projects under processing
The Directorate General for Energy Policy denies Lavanda Desarrollos España the modification of its 93 MW solar plant in Alicante. Connection permits expired an...
Lavanda Desarrollos España, SL, developer of the El Secarral photovoltaic project in Alicante
The Government authorizes Repsol to expand the reversible hydroelectric power plant at Aguayo in Cantabria, with a turbining capacity of 1,014 MW. The facility ...
Repsol Generación Eléctrica, municipalities of San Miguel de Aguayo, Bárcena de Pie de Concha and Molledo (Cantabria)