Energy BOE Importance: 3/10

Authorization Denied for Hybrid Solar Plant with 'El Gallo' Wind Farm in Burgos Due to Lack of State Competence

09 Nov 2026 Effective: 09 Nov 2026 0 views
Who is affected:
CYL Energía Eólica, SLU, and promoters of hybrid renewable installations in Burgos

Summary

The Ministry denies authorization to CYL Energía Eólica to install a 16.18 MW photovoltaic plant in Burgos because, by reducing the power to 49.7 MW, the project falls outside state competence.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines dismisses the request from CYL Energía Eólica, SLU, to build the 'El Gallo' photovoltaic plant (16.18 MW) in Castrojeriz and Los Balbases (Burgos), intended to be hybridized with the homonymous wind farm of 49.4 MW. The reason is that the promoter itself reduced the i…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 22 de octubre de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de CYL Energía Eólica, SLU, de autorización administrativa previa, autorización administrativa de construcción y declaración, en concreto, de utilidad pública para la planta fotovoltaica «El Gallo», de 16,18 MW de potencia instalada, y para una parte de su infraestructura de evacuación, para su hibridación con el parque eólico existente «El Gallo», de 49,4 MW de potencia instalada, en Castrojeriz y Los Balbases (Burgos).

Related regulations

Almost there