Energy BOE Importance: 3/10

State authorization denied for solar plant in Burgos after power reduction below 50 MW

09 Nov 2026 Effective: 09 Nov 2026 0 views
Who is affected:
CYL Energía Eólica, SLU, and renewable energy developers with hybrid installations in Burgos

Summary

The State denies authorization for the 'Los Zapateros' photovoltaic plant in Burgos because the developer reduced its power to 0.3 MW, falling outside state competence. Authorization must be processed by the autonomous community.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines dismisses the application by CYL Energía Eólica, SLU, for a 16.8 MW photovoltaic plant in Burgos intended to be hybridized with an existing wind farm. The reason is that during the public consultation period the developer reduced the installed power of the hybridizati…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 22 de octubre de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de CYL Energía Eólica, SLU, de autorización administrativa previa, autorización administrativa de construcción y declaración, en concreto, de utilidad pública para la planta fotovoltaica «Los Zapateros», de 16,8 MW de potencia instalada, para su hibridación con el parque eólico existente «Los Zapateros», de 49,4 MW, y una parte de su infraestructura de evacuación, en Castrojeriz y Los Balbases (Burgos).