Correction of the European regulation on renewable energy auctions
29 Jul 202650 views
Who is affected:
Renewable energy promoters and companies participating in European auctions
Summary
The EU corrects errors in the regulation that sets the criteria for participating and winning renewable energy auctions. It affects the rules for awarding renewable projects in Europe.
Detailed analysis
PRO
This corrigendum corrects Commission Implementing Regulation (EU) 2025/1176, published on 18 June 2025, which establishes the pre-qualification and award criteria applicable to auctions for the deployment of renewable energies. The corrections may affect technical, financial or administrative requirements that promoter…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
OJ:L_202690632: Rectificatif au règlement d’exécution (UE) 2025/1176 de la Commission du 23 mai 2025 précisant les critères de préqualification et d’attribution applicables aux enchères pour le déploiement de l’énergie produite à partir de sources renouvelables (JO L, 2025/1176, 18.6.2025)
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection
Naturgy Renovables withdraws its application to build a 39 MW photovoltaic plant and 20 MW battery in Valladolid. The Ministry accepts the withdrawal and closes...
Naturgy Renovables SLU and photovoltaic project developers in state processing