Energy BOE Importance: 3/10

Authorization of solar storage battery in Teruel and rejection of San Jorge wind farm

30 Jul 2026 Effective: 01 Apr 2026 31 views
Who is affected:
Enel Green Power España and renewable energy developers in Teruel (Aragón)

Summary

A 41.58 MW battery is authorized to hybridize with the Mudéjar solar park in Teruel, but the 75 MW San Jorge wind farm is denied due to incompatibilities with other projects.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Enel Green Power España prior authorization for the 41.58 MW Mudéjar BESS storage system, which will be hybridized with the 66 MW Mudéjar-Millán Hernández Bonaga photovoltaic park already operational in Teruel. The authorization includes necessary evacuation in…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 1 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Enel Green Power España, SLU, autorización administrativa previa para el módulo de almacenamiento con baterías «BESS Mudéjar», de 41,58 MW de potencia instalada, y sus infraestructuras de evacuación, para su hibridación con el parque solar fotovoltaico Mudéjar-Millán Hernández Bonaga, de 66 MW, y se desestima la solicitud de autorización administrativa previa para el módulo eólico «San Jorge», de 75 MW, en los términos municipales de Andorra y Albalate del Arzobispo (Teruel).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations