Nuclear fuel factory authorization in Juzbado (Salamanca) renewed for 10 years
27 Jul 2026Effective: 05 Jul 202649 views
Who is affected:
ENUSA Industrias Avanzadas SA and Spanish nuclear sector
Summary
The Ministry renews for 10 years the operating permit for ENUSA's nuclear fuel factory in Juzbado, Salamanca. The authorization enters into force on July 5, 2026.
Detailed analysis
PRO
Orden TED/775/2026 grants ENUSA Industrias Avanzadas the renewal of the operating authorization for its nuclear fuel factory in Juzbado (Salamanca) for a period of ten years from July 5, 2026. The facility is authorized to manufacture up to 500 tonnes/year of uranium in fuel elements with maximum enrichment of 5% in U-…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Orden TED/775/2026, de 24 de junio, por la que se concede a Industrias Avanzadas, SA, S.M.E., la renovación de la autorización de explotación de la fábrica de combustible en Juzbado, Salamanca.
Planta Solar OPDE 25 is authorized to build a 43.9 MW battery storage system alongside its Covatillas 3 photovoltaic park in Castillejo de Iniesta (Cuenca). The...
Promoting company Planta Solar OPDE 25 SL and renewable energy sector in Cuenca
Arena Power Solar 33 renounces construction of a 54 MW solar plant in Beas and Trigueros (Huelva) due to incompatibility with the future Seville-Huelva high-spe...
Promoter company Arena Power Solar 33 SLU and municipalities of Beas and Trigueros (Huelva)
Arena Power Solar 35 renounces construction of a 57.5 MW solar plant in Huelva as it interferes with the future Seville-Huelva high-speed rail route. The Direct...
Renewable energy developers and photovoltaic sector companies in Huelva
Savanna Power Solar 9 withdraws from building a 59 MW solar plant in Huelva due to incompatibility with the future AVE Sevilla-Huelva. The Ministry accepts the ...
Renewable energy developers and photovoltaic sector in Huelva
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia