Aquarii 70 MW wind farm in León cancelled due to incompatibility with Cantabrian capercaillie protection
06 Aug 2026Effective: 06 Aug 202694 views
Who is affected:
Renewable energy developers in areas protected for endangered wildlife in Spain
Summary
Planta FV 127 withdraws its application to build a hybrid wind farm in León after being declared environmentally unfeasible due to impact on Cantabrian capercaillie.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines accepts the withdrawal by Planta FV 127, SLU, for the Aquarii 70 MW wind farm and its hybridization with the Aquarii Solar photovoltaic plant of 89.632 MW in León. The promoter withdrew the application after receiving unfavorable reports, especially from the Junta de …
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 16 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Planta FV 127, SLU, de la solicitud de autorización administrativa previa para el parque eólico Aquarii de 70 MW, para su hibridación con la instalación fotovoltaica Aquarii Solar, de 89,632 MW, y para una parte de su infraestructura de evacuación, en la provincia de León.
Environmental conditions are updated for two solar parks in Paracuellos de Jarama and Ajalvir (Madrid) to allow panel installation on slopes greater than 10% us...
Promoters Azor Solar SLU and Avutarda Solar SLU; environmental administrations of Madrid
Desarrollos Renovables Eólicos y Solares company withdraws from building the Taraguilla wind farm in Cádiz. The administration accepts the withdrawal and closes...
Renewable energy developers and wind sector in Spain, especially in Andalusia
Authorization is granted to build a 400 kV aerial line of approximately 58 km between two substations in Teruel. The work is declared of public utility, which a...
Red Eléctrica de España, municipalities in Teruel affected and landowners along the route
The Ministry denies Iberdrola permission to build a 32 MW photovoltaic module in Soria for failing to provide required documentation. The company did not meet e...
Iberdrola Renovables Castilla y León and renewable energy project developers in Spain
The Directorate General for Energy Policy denies Biovent Energía authorization to build a photovoltaic plant in Soria for failing to demonstrate compliance with...
Biovent Energía SA and renewable energy project promoters in Spain
The Directorate General for Energy Policy denies Biovent Energía the construction of a 30 MW photovoltaic plant in Soria for failing to remedy required technica...
Biovent Energía SA and renewable energy project promoters under processing