Construction of 28.5 MW solar module in Soria denied for failing to meet environmental requirements
06 Aug 2026Effective: 06 Aug 2026115 views
Who is affected:
Biovent Energía SA and renewable energy project promoters in Spain
Summary
The Directorate General for Energy Policy denies Biovent Energía authorization to build a photovoltaic plant in Soria for failing to demonstrate compliance with required environmental conditions.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines dismisses Biovent Energía's request to build the FV Hontalbilla II photovoltaic module (28.5 MW) in Soria, intended to be hybridized with the existing wind farm. The denial is based on non-compliance with environmental conditions of the Environmental Impact Assessment…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 8 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Biovent Energía, SA, de autorización administrativa de construcción y declaración, en concreto, de utilidad pública del módulo fotovoltaico «FV Hontalbilla II», de 28,5 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con el parque eólico existente Hontalbilla II, en Adradas, Baraona y Villasayas (Soria).
The Ministry denies Iberdrola permission to build a 32 MW photovoltaic module in Soria for failing to provide required documentation. The company did not meet e...
Iberdrola Renovables Castilla y León and renewable energy project developers in Spain
Planta FV 127 withdraws its application to build a hybrid wind farm in León after being declared environmentally unfeasible due to impact on Cantabrian capercai...
Renewable energy developers in areas protected for endangered wildlife in Spain
Environmental conditions are updated for two solar parks in Paracuellos de Jarama and Ajalvir (Madrid) to allow panel installation on slopes greater than 10% us...
Promoters Azor Solar SLU and Avutarda Solar SLU; environmental administrations of Madrid
The Directorate General for Energy Policy denies Biovent Energía the construction of a 30 MW photovoltaic plant in Soria for failing to remedy required technica...
Biovent Energía SA and renewable energy project promoters under processing
The Ministry denies authorization for the FV Caiba photovoltaic plant in Villamanta (Madrid) following an unfavorable environmental impact assessment due to dam...
Promoters of photovoltaic plants and renewable projects in administrative processing
Nicewinds Partners withdraws from the Pasama wind farm in Soria because it obtained environmental assessment outside the deadline, losing grid connection permit...
Wind farm developers and renewable energy companies in Spain