Construction of 28.5 MW solar module in Soria denied for failing to meet environmental requirements
06 Aug 2026Effective: 06 Aug 202634 views
Who is affected:
Biovent Energía SA and renewable energy project promoters in Spain
Summary
The Directorate General for Energy Policy denies Biovent Energía authorization to build a photovoltaic plant in Soria for failing to demonstrate compliance with required environmental conditions.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines dismisses Biovent Energía's request to build the FV Hontalbilla II photovoltaic module (28.5 MW) in Soria, intended to be hybridized with the existing wind farm. The denial is based on non-compliance with environmental conditions of the Environmental Impact Assessment…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 8 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Biovent Energía, SA, de autorización administrativa de construcción y declaración, en concreto, de utilidad pública del módulo fotovoltaico «FV Hontalbilla II», de 28,5 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con el parque eólico existente Hontalbilla II, en Adradas, Baraona y Villasayas (Soria).
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection
Naturgy Renovables withdraws its application to build a 39 MW photovoltaic plant and 20 MW battery in Valladolid. The Ministry accepts the withdrawal and closes...
Naturgy Renovables SLU and photovoltaic project developers in state processing