Energy BOE Importance: 3/10

Authorization to install a 39.6 MW battery system next to the Afrodita solar plant in Seville

18 Aug 2026 Effective: 18 Aug 2026 24 views
Who is affected:
Renewable energy sector companies, solar plant and storage developers

Summary

Afrodita Solar is authorized to build a 39.6 MW battery storage module in Los Molares (Seville) to hybridize it with its existing 46.2 MW solar park.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Afrodita Solar, SL, prior administrative and construction authorization for a 39.6 MW BESS system in Los Molares (Seville). The installation will be hybridized with the existing 'Afrodita' photovoltaic park of 46.2 MW, leveraging its evacuation infrastructure t…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 31 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Afrodita Solar, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Bess Afrodita», de 39,6 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Afrodita», de 46,2 MW de potencia instalada, en Los Molares (Sevilla).