Energy BOE Importance: 3/10

Authorization of 39.6 MW storage battery system to hybridize with Don Rodrigo II solar plant in Utrera (Seville)

19 Aug 2026 7 views
Who is affected:
Promoter company Urso Solar SLU and renewable energy sector in Andalusia

Summary

The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored and better managed on the electrical grid.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Urso Solar, SLU prior authorization and construction permit for a 39.6 MW battery storage module in Utrera (Seville), which will be hybridized with the Don Rodrigo II photovoltaic park of 45.6 MW already in operation. The processing was conducted under the simp…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 31 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Urso Solar, SLU, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Don Rodrigo II», de 39,6 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Don Rodrigo II», de 45,6 MW de potencia instalada, en Utrera (Sevilla).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations