Authorization of 39.6 MW storage battery system to hybridize with Don Rodrigo II solar plant in Utrera (Seville)
19 Aug 202691 views
Who is affected:
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Summary
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored and better managed on the electrical grid.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants Urso Solar, SLU prior authorization and construction permit for a 39.6 MW battery storage module in Utrera (Seville), which will be hybridized with the Don Rodrigo II photovoltaic park of 45.6 MW already in operation. The processing was conducted under the simp…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 31 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Urso Solar, SLU, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Don Rodrigo II», de 39,6 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Don Rodrigo II», de 45,6 MW de potencia instalada, en Utrera (Sevilla).
The EU corrects translation errors in model contractual clauses so that importers of oil, gas and coal can demonstrate compliance with methane pollution control...
European importers of crude oil, natural gas, LNG and coal, and their foreign suppliers
Savanna Power Solar 9 withdraws from building a 59 MW solar plant in Huelva due to incompatibility with the future AVE Sevilla-Huelva. The Ministry accepts the ...
Renewable energy developers and photovoltaic sector in Huelva
Planta Solar OPDE 25 is authorized to build a 43.9 MW battery storage system alongside its Covatillas 3 photovoltaic park in Castillejo de Iniesta (Cuenca). The...
Promoting company Planta Solar OPDE 25 SL and renewable energy sector in Cuenca
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Red Eléctrica to build a new 400 kV electrical substation in Isona (Lleida) and declares the work of public utility. The installation ...
Red Eléctrica de España, owners of affected properties in Isona i Conca Dellà (Lleida)