Authorization of 39.6 MW storage battery system to hybridize with Don Rodrigo II solar plant in Utrera (Seville)
19 Aug 20267 views
Who is affected:
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Summary
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored and better managed on the electrical grid.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants Urso Solar, SLU prior authorization and construction permit for a 39.6 MW battery storage module in Utrera (Seville), which will be hybridized with the Don Rodrigo II photovoltaic park of 45.6 MW already in operation. The processing was conducted under the simp…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 31 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Urso Solar, SLU, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Don Rodrigo II», de 39,6 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Don Rodrigo II», de 45,6 MW de potencia instalada, en Utrera (Sevilla).
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection
Naturgy Renovables withdraws its application to build a 39 MW photovoltaic plant and 20 MW battery in Valladolid. The Ministry accepts the withdrawal and closes...
Naturgy Renovables SLU and photovoltaic project developers in state processing
The Government authorizes Red Eléctrica to build a new 400 kV electrical substation in Isona (Lleida) and declares the work of public utility. The installation ...