Authorization to divert a medium voltage electrical line in Mallén and Cortes for the construction of the A-68
15 Oct 2026Effective: 15 Oct 20260 views
Who is affected:
EDistribución Redes Digitales and Copisa Constructora Pirenaica; municipalities of Mallén and Cortes
Summary
EDistribución is authorized to build a variant of a medium voltage electrical line affected by the works of the A-68 highway in Zaragoza and Navarra.
Detailed analysis
PRO
The General Directorate of Energy Policy and Mines grants EDistribución Redes Digitales, SLU, prior authorization and construction permit to divert a medium voltage line (13 kV) from the Cortes substation, affected by the new A-68 highway. The project includes 176 m of underground line and two aerial sections of 43 and…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 16 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a EDistribución Redes Digitales, SLU, autorización administrativa previa y autorización administrativa de construcción del proyecto «Variante de media tensión desde SET Cortes», en Mallén (Zaragoza) y Cortes (Navarra).
Ictio Solar Auriga is authorized to install a 19.96 MW battery system alongside its existing solar plant in Ciudad Real, forming a hybrid installation of 67 MW.
Ictio Solar Auriga SL and renewable energy sector in Castilla-La Mancha
Ictio Solar Berenice is authorized to install a battery system of almost 20 MW alongside its existing photovoltaic plant in Ciudad Real, forming a combined inst...
Ictio Solar Berenice SL and energy operators in the Alcázar de San Juan area
Technical corrections to the European RED III Directive promoting renewable energy are published. It affects regulations on fuels and renewable energy targets i...
Energy companies, renewable energy developers, biofuel producers, and public administrations
The Ministry approves the environmental impact of the Muracais wind farm in Lugo, with 13 wind turbines and 52.8 MW. The project includes electrical evacuation ...
Promoter Antila Solar SL, municipalities of Castroverde, Baleira and A Fonsagrada (Lugo)
The environmental impact statement for the Fontefría Norte wind cluster in Pontevedra is approved, comprising 25 wind turbines and 180 MW of capacity after redu...
Wind energy promoters, affected municipalities in Pontevedra and renewable energy sector