Energy BOE Importance: 3/10

Authorization of 20 MW storage battery system to hybridize with solar plant in Alcázar de San Juan

14 Oct 2026 Effective: 14 Oct 2026 1 views
Who is affected:
Ictio Solar Auriga SL and renewable energy sector in Castilla-La Mancha

Summary

Ictio Solar Auriga is authorized to install a 19.96 MW battery system alongside its existing solar plant in Ciudad Real, forming a hybrid installation of 67 MW.

Detailed analysis PRO

The Dirección General de Política Energética y Minas grants prior administrative authorization to Ictio Solar Auriga, SL for a 19.96 MW battery storage module in Alcázar de San Juan (Ciudad Real), which will be hybridized with the FV Ictio Alcázar II photovoltaic plant of 47.19 MW already in operation. The combined ins…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 7 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Ictio Solar Auriga, SL, la autorización administrativa previa para el módulo de almacenamiento por baterías «ALM Ictio Alcázar II», de 19,96 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la planta fotovoltaica existente, «FV Ictio Alcázar II», de 47,19 MW de potencia instalada, conformando una instalación de 67,15 MW de potencia instalada, en Alcázar de San Juan (Ciudad Real).

Related regulations