Summary
Red Eléctrica is authorized to build a 400 kV line between Itxaso (Gipuzkoa) and Castejón/Muruarte (Navarra). The project strengthens the national electricity transmission network and replaces old 220 kV lines.
Detailed analysis
PRO
The Dirección General de Política Energética y Minas grants Red Eléctrica de España, SAU, prior authorization and construction permit for a 400 kV double-circuit overhead line between Gipuzkoa and Navarra, declaring it of public utility. This declaration allows Red Eléctrica to exercise compulsory expropriation of the …
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 6 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Red Eléctrica de España, SAU, autorización administrativa previa y autorización administrativa de construcción de la línea aérea de transporte de energía eléctrica a 400 kV, doble circuito, Itxaso-Castejón/Muruarte, en la provincia de Gipuzkoa y en la Comunidad Foral de Navarra, y se declara, en concreto, la utilidad pública.
Red Eléctrica will be able to close and dismantle the Itxaso-Orcoyen 1 and 2 electrical lines to build a new higher capacity 400 kV line between both autonomous...
Red Eléctrica de España and administrations of Navarra and Gipuzkoa
Spain authorizes Esteyco to install the WHEEL floating offshore wind energy prototype off Gran Canaria. It is a 6 MW R&D+i project on the PLOCAN ocean platform.
Esteyco SA, renewable marine energy sector, administrations in the Canary Islands
The Government establishes new rules for electricity companies to plan and publish their network investments. The aim is greater transparency and ensuring inves...
Electricity transmission and distribution companies, industry, renewable energy developers and consumers
A 41.58 MW battery is authorized to hybridize with the Mudéjar solar park in Teruel, but the 75 MW San Jorge wind farm is denied due to incompatibilities with o...
Enel Green Power España and renewable energy developers in Teruel (Aragón)
The Government allocates to La Barca Energía the capacity for access to the electrical grid at Narcea (Asturias) to install 320 MW of renewable generation. The ...
Renewable generation companies, energy developers and just transition territories in Asturias