Energy BOE Importance: 3/10

Authorization of 68.51 MW storage battery system to hybridize with solar plant in Paracuellos de Jarama

12 Oct 2026 Effective: 12 Oct 2026 0 views
Who is affected:
Azor Solar SLU and renewable energy sector; indirectly the municipality of Paracuellos de Jarama

Summary

The Government authorizes Azor Solar to install a 68.51 MW battery system alongside its existing photovoltaic plant in Madrid. The installation will use the evacuation infrastructure already approved.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants prior administrative authorization to Azor Solar, SLU for a 68.51 MW battery storage system in Paracuellos de Jarama, which will be hybridized with its 64.02 MW photovoltaic plant already in operation. The project passed the simplified environmental impact asse…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 9 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Azor Solar, SLU, autorización administrativa previa para el proyecto de almacenamiento con baterías Azor Solar, de 68,51 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la instalación solar fotovoltaica existente Azor Solar, de 64,02 MW de potencia instalada, en Paracuellos de Jarama (Madrid).