Key data
| Regulation | Resolution of September 1, 2026, from the General Directorate of Energy Policy and Mines |
|---|---|
| BOE Publication | September 18, 2026 |
| Effective date | September 1, 2026 |
| Authorization holder | Redexis Infraestructuras, SL |
| Biomethane producer | GIA EnR V SLU |
| Location | La Almunia de Doña Godina (Zaragoza) |
| Affected gas pipeline | Zaragoza-Calatayud (primary transport) |
| Maximum injection capacity | 1,500 Nm³/h of biomethane |
| Injection pressure | 80 bar |
| Piping | 4 inches, 16 meters in length |
| Category | Energy / Renewable Gases |
| Year | 2026 |
The integration of renewable gases into the conventional gas transport network takes a concrete step in Aragón. The General Directorate of Energy Policy and Mines has granted Redexis Infraestructuras, SL, the administrative authorization and approval of the execution project to install a new biomethane connection point on the primary transport gas pipeline Zaragoza-Calatayud, at the level of La Almunia de Doña Godina (Zaragoza). The resolution is dated September 1, 2026 and was published in the BOE on September 18, 2026.
The biomethane to be injected comes from the production plant of GIA EnR V SLU. The authorized infrastructure is technically simple but strategically relevant: a 4-inch piping system 16 meters in length with a sectioning valve that allows renewable gas to be discharged directly into the high-pressure network.
What does this regulation establish?
The resolution grants two simultaneous authorizations to Redexis Infraestructuras, SL:
- Administrative authorization to build and operate the new connection point.
- Approval of the execution project of the installations described in the "Project for a new position on the Zaragoza-Calatayud gas pipeline for biomethane injection in La Almunia de Doña Godina (Zaragoza)".
The authorized technical characteristics are as follows:
| Technical parameter | Authorized value |
|---|---|
| Maximum injection flow | 1,500 Nm³/h |
| Operating pressure | 80 bar |
| Piping diameter | 4 inches |
| Piping length | 16 meters |
| Cutting element | Sectioning valve |
| Receiving network | Zaragoza-Calatayud primary transport gas pipeline |
The file passed the public information process without objections, has a favorable report from the CNMC and from the Industry and Energy Area of Zaragoza, and did not require environmental impact assessment. The administrative process, therefore, was completed without significant obstacles.
Economic and operational impact
For Redexis Infraestructuras, SL, this authorization represents the definitive enablement to operate a new gas infrastructure asset oriented toward renewable gas. The connection allows monetizing the biomethane produced by GIA EnR V SLU by introducing it directly into the primary transport network, with access to the national gas market.
From an operational perspective, the most relevant impacts are:
- For Redexis: new network asset that expands its position in renewable gas infrastructure in Aragón.
- For GIA EnR V SLU: guaranteed access to the transport network to place its biomethane production up to 1,500 Nm³/h.
- For the Aragonese gas market: first biomethane injection point in the Zaragoza-Calatayud section, which sets a precedent for future similar requests in the area.
- For decarbonization: the integration of biomethane into high-pressure networks (80 bar) is one of the key vectors of Spain's renewable gases roadmap.
The infrastructure is of reduced scale (16 meters of piping), indicating that construction costs are limited. The strategic value lies in access to the connection point with the primary transport network, which is the usual bottleneck for biomethane producers.
Who does it affect?
- Redexis Infraestructuras, SL: authorization holder and responsible for building and operating the new position on the gas pipeline.
- GIA EnR V SLU: biomethane producer whose plant is connected to the primary transport network thanks to this infrastructure.
- Other biomethane producers in Aragón: the administrative precedent (without objections, without environmental assessment) facilitates the processing of similar projects in the same region.
- Gas transport network operators: must integrate the new injection point into their operational and safety protocols.
- Energy sector companies with assets in the Zaragoza-Calatayud corridor: the entry of biomethane in this section may affect capacity planning and gas quality.
- Energy administration of Aragón: the Industry and Energy Area of Zaragoza issued a favorable report and will continue to be the reference body for monitoring the installation.
Practical example
GIA EnR V SLU operates a biomethane production plant in La Almunia de Doña Godina. Until the approval of this resolution, the biomethane produced could not be injected directly into the primary transport network due to lack of the authorized connection point.
With the infrastructure now approved, the plant can inject up to 1,500 Nm³/h of biomethane at 80 bar into the Zaragoza-Calatayud gas pipeline. If the plant operates at full capacity for 8,000 hours per year (standard reference for biomethane installations), the annual injected volume would reach 12,000,000 Nm³/year of renewable gas introduced into the national transport network, directly contributing to the renewable gas blending objectives established in Spanish energy regulations.
The physical connection is made through a 4-inch piping system just 16 meters long, with a sectioning valve that allows rapid shutdown in case of operational need or maintenance, complying with the safety requirements demanded by the CNMC.
What should companies do now?
- Biomethane producers in Aragón: analyze whether your plant is in the area of influence of the Zaragoza-Calatayud gas pipeline or other sections of the Redexis network to assess the viability of a similar connection request.
- Biomethane project promoters: review the file of this resolution as a model of successful processing (without objections, without environmental assessment), and identify what reports are necessary: CNMC and Industry and Energy Area of the corresponding autonomous community.
- Gas network operators: update the operational schemes of the Zaragoza-Calatayud section to incorporate the new biomethane injection point in La Almunia de Doña Godina.
- Energy advisors and consultants: use this case as a reference for clients who want to connect biomethane production to primary transport networks in Spain, especially regarding technical requirements (pressure, diameter, sectioning valve).
- Companies with decarbonization strategy: identify opportunities to purchase certified biomethane from installations connected to the transport network, such as GIA EnR V SLU's, to meet emission reduction objectives.
Frequently asked questions
How much biomethane can Redexis inject into the Zaragoza-Calatayud gas pipeline?
The resolution authorizes a maximum capacity of 1,500 Nm³/h of biomethane at a pressure of 80 bar. The biomethane comes from GIA EnR V SLU's production plant, located in La Almunia de Doña Godina (Zaragoza).
What physical infrastructure has been authorized for the connection?
The construction of a 4-inch piping system 16 meters in length, equipped with a sectioning valve, has been approved. This infrastructure connects GIA EnR V SLU's plant with the Zaragoza-Calatayud primary transport gas pipeline.
What bodies have approved this project?
The project has a favorable report from the CNMC and from the Industry and Energy Area of Zaragoza. Additionally, it passed the public information process without any objections and did not require environmental impact assessment.
When does this authorization take effect?
The resolution is dated September 1, 2026 and was published in the BOE on September 18, 2026. The authorization is effective from the date of the resolution.
Can other biomethane producers in Aragón request a similar connection?
Yes. This file sets a relevant administrative precedent: processing without objections and without environmental assessment. Other biomethane producers in the vicinity of the Zaragoza-Calatayud gas pipeline can initiate a similar process before the General Directorate of Energy Policy and Mines, proving technical requirements and obtaining favorable reports from the CNMC and the competent autonomous body.
Official source
Consult complete regulation in official source
Notice: This article is for informational purposes only and does not constitute legal advice. For specific decisions, consult a qualified professional. Source: https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-19475