Biomethane in León: Enagás connects new injection to Zamora-Benavente-León pipeline
Enagás Transporte installs position O-07X with G-65 measurement station in León to inject biomethane into the Zamora-Ben...
8 Articles
Enagás Transporte installs position O-07X with G-65 measurement station in León to inject biomethane into the Zamora-Ben...
Enagás obtains authorization to connect biomethane to the Salamanca-Zamora pipeline in Zamora. Key opportunity for renew...
Energía Glauco SL receives prior authorization for a 55,384 MW plant in Girona. First formal step before construction. K...
EU Regulation 2026/1030 requires measuring and reporting CO2 emissions in transport with standardized methodology. It af...
Ferrol Port signs agreement with Galicia Technological Institute to optimize its electrical model and reduce energy cost...
EU Regulation 2026/1046 modifies the calculation of CO2 emission credits for trucks and buses in 2025-2029. Manufacturer...
Law 2/2026 of Andalusia unifies and tightens environmental permits for industrial companies, developers and construction...
The EU sets its position at ICAO on noise, air quality and CO2 amendments. Airlines, manufacturers and airports must ant...
Solemos responder en pocos minutos