The CNMC approves the final values of incentives or penalties to Red Eléctrica for its performance as electricity system operator in 2025. This adjusts its remuneration according to efficiency objectives met.
Detailed analysis
PRO
The CNMC, in accordance with Circular 4/2019 as amended by Circular 1/2023, determines the final values of incentives to the remuneration of the electricity system operator (Red Eléctrica) for 2025. The base remuneration for the regulatory period 2023-2025 is 77.190 thousand euros, with an incentive ceiling of 2% (1.54…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 23 de octubre de 2026, de la Comisión Nacional de los Mercados y la Competencia, por la que se aprueban los valores definitivos de los incentivos a la retribución del operador del sistema para el año 2025.
The average energy price for calculating the remuneration of the interruptibility service in the Canary Islands, Balearic Islands, Ceuta and Melilla is set at 1...
Large industrial consumers in the Canary Islands, Balearic Islands, Ceuta and Melilla with interruptibility service
Red Eléctrica is authorized to build a medium voltage electrical line to supply the Maguilla 400 kV substation in Badajoz. The installation is declared to be of...
Red Eléctrica de España and landowners affected in Maguilla (Badajoz)
Authorization is granted to Estudios y Proyectos Pradamap to build an underground line and a transformation center to supply the wind farm substation in La Muda...
Promoting company Estudios y Proyectos Pradamap, SLU, and the wind energy sector in Valladolid
The environmental impact declaration requires reducing the Mudéjar renewable project power from 1,844 MW to 406 MW. Employment and local investment commitments ...
Enel Green Power España, administrations of Teruel and Zaragoza, renewable sector
The CSN temporarily recovers inspections of radioactive installations and radioactive material transport in Galicia because the Xunta has been left without a qu...
Holders of radioactive installations and medical radiodiagnosis equipment in Galicia
The environmental impact statement is approved for a wind farm with 5 wind turbines (33 MW) in Puerto Real (Cádiz) that will be combined with an already operati...
Promoter BRUC Las Quinientas SL, municipalities of Puerto Real and Jerez de la Frontera (Cádiz)