Energy BOE Importance: 3/10

Authorization for electrical infrastructure construction of Pinta and Guindalera wind farm in Valladolid

04 Nov 2026 2 views
Who is affected:
Promoting company Estudios y Proyectos Pradamap, SLU, and the wind energy sector in Valladolid

Summary

Authorization is granted to Estudios y Proyectos Pradamap to build an underground line and a transformation center to supply the wind farm substation in La Mudarra, Valladolid.

Detailed analysis PRO

The Dirección General de Política Energética y Minas grants prior and construction authorization to Pradamap, SLU, for a 323-meter underground line at 13.2 kV and a 100 kVA transformation center in La Mudarra (Valladolid). This infrastructure will supply the auxiliary services of the Villalba 220 kV sectionalizing subs…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 18 de octubre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Estudios y Proyectos Pradamap, SLU, autorización administrativa previa y autorización administrativa de construcción para una línea subterránea a 13,2 kV y un centro de transformación de servicios auxiliares, para punto de suministro en la subestación seccionadora «Villalba 220 kV», como parte de las infraestructuras de evacuación de parque eólico «Pinta y Guindalera», en La Mudarra (Valladolid).

Related regulations

Almost there