Energy BOE Importance: 3/10

The Government accepts Saresun's withdrawal of its application to build the Trespuntas I solar plant of 47 MW in Albacete

16 Nov 2026 Effective: 16 Nov 2026 19 views
Who is affected:
Promoter company Saresun Trespuntas SL and solar projects linked to the same evacuation infrastructure in Albacete and Valencia

Summary

The Directorate General for Energy Policy accepts Saresun Trespuntas's withdrawal to build a 47 MW photovoltaic plant in Almansa (Albacete). The project is cancelled after failing to meet the required environmental requirements.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines accepts the withdrawal by Saresun Trespuntas, SL, of its application for prior administrative authorization and construction for the Trespuntas I photovoltaic plant (47.25 MW) in Almansa, Albacete. The project had obtained a favorable environmental impact declaration …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 9 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Saresun Trespuntas, SL, de solicitud de autorización administrativa previa y autorización administrativa de construcción para la instalación fotovoltaica «Trespuntas I», de 47,25 MW de potencia instalada, y su infraestructura de evacuación, en la provincia de Albacete.

Related regulations