Energy BOE Importance: 3/10

Authorization for 22 MW solar plant in Ávila to be combined with existing wind farm

16 Nov 2026 Effective: 16 Nov 2026 8 views
Who is affected:
Eólica Sierra de Ávila SL, local administrations of Padiernos and Niharra, and Red Eléctrica de España

Summary

The Government authorizes a 22 MW photovoltaic installation in Padiernos and Niharra (Ávila) to be hybridized with an already operational wind farm. The project has passed environmental impact assessment with conditions.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants prior administrative authorization to Eólica Sierra de Ávila, SL to build the Colladillo photovoltaic plant of 22.05 MW in Ávila, which will be hybridized with its homonymous wind farm of 30.06 MW already registered in the administrative registry. The processin…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 23 de octubre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Eólica Sierra de Ávila, SL, autorización administrativa previa para la instalación fotovoltaica Colladillo, de 22,05 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con el parque eólico Colladillo, de 30,06 MW de potencia instalada, en Padiernos y Niharra (Ávila).

Related regulations

Almost there