Authorization Denied for Toledo Solar 46 MW Solar Plant in Toledo Province
16 Nov 2026Effective: 16 Nov 202612 views
Who is affected:
Desarrollos Fotovoltaicos Ibéricos 1 SLU and the photovoltaic sector in Toledo
Summary
The Ministry denies the Toledo Solar photovoltaic park due to negative environmental impact. The promoting company accepts the resolution without waiving its rights.
Detailed analysis
PRO
The General Directorate of Energy Policy and Mines dismisses the request for prior administrative authorization of the Toledo Solar park (46.26 MW) in Toledo, following an unfavorable environmental impact declaration issued in June 2023. The project, requested in 2021, affected twelve municipalities in Toledo and inclu…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 7 de octubre de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Desarrollos Fotovoltaicos Ibéricos 1, SLU, de autorización administrativa previa de la instalación fotovoltaica Toledo Solar, de 46,26 MW de potencia instalada, y de parte de su infraestructura de evacuación, en la provincia de Toledo.
The Government denies authorization for the Rojalinda photovoltaic plant following an unfavorable environmental assessment. The project also lacked grid connect...
Promoting company Energía, Innovación y Desarrollo Fotovoltaico, SA and the photovoltaic sector
The Government authorizes a 22 MW photovoltaic installation in Padiernos and Niharra (Ávila) to be hybridized with an already operational wind farm. The project...
Eólica Sierra de Ávila SL, local administrations of Padiernos and Niharra, and Red Eléctrica de España
The Ministry disqualifies Haxx Spaniard Operator Licence, SL from operating as a fuel wholesaler for failing to demonstrate financial capacity and for serious v...
Wholesale fuel and petroleum product operators registered with the CNMC
The Directorate General for Energy Policy accepts Saresun Trespuntas's withdrawal to build a 47 MW photovoltaic plant in Almansa (Albacete). The project is canc...
Promoter company Saresun Trespuntas SL and solar projects linked to the same evacuation infrastructure in Albacete and Valencia
The Government sets the maximum price of commercial bottled butane (cylinders of 8 to 20 kg) at 127.78 cents per kilo before taxes, effective as of November 17,...
Distributors and consumers of bottled butane (8-20 kg cylinders) throughout Spain