Authorization Denied for 33 MW Solar Plant in Soria Due to Expiration of Grid Connection Permits

20 Oct 2026 Effective: 20 Oct 2026 5 views
Who is affected:
Iberenova Promociones SA and renewable energy project promoters with grid permits

Summary

The Directorate General for Energy Policy denies Iberenova the construction of a photovoltaic plant in Soria after its grid access permits expire without obtaining the environmental impact assessment within the required timeframe.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines rejects Iberenova Promociones' application to build a 33.825 MW photovoltaic installation in Soria, intended to be hybridized with an existing wind farm. The main reason is the expiration of access and connection permits to the transmission network at the Almazán 400 …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 9 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Iberenova Promociones, SA, de autorización administrativa previa y autorización de construcción de la instalación fotovoltaica Los Campillos, de 33,825 MW de potencia instalada, para su hibridación con el parque eólico Los Campillos, de 34 MW de potencia instalada, en la provincia de Soria.