Energy BOE Importance: 3/10

Authorization of 26.74 MW storage battery to hybridize with solar plant in Zaragoza

20 Oct 2026 Effective: 20 Oct 2026 5 views
Who is affected:
Renewable energy developers, energy sector and administrations in Aragón

Summary

Planta Solar OPDE 3 is authorized to add a 26.74 MW battery system to its existing solar park in La Muela and Muel (Zaragoza). The installation improves renewable energy storage capacity.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Planta Solar OPDE 3, SL prior and construction authorization for a 26.74 MW battery storage module to be hybridized with the Los Belos photovoltaic park (41.6 MW) in Zaragoza. The procedure was conducted under the simplified procedure of RD 997/2025, which stre…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 16 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta Solar OPDE 3, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Hibridación Los Belos», de 26,74 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Los Belos», de 41,6 MW de potencia instalada, en La Muela y Muel (Zaragoza).