Energy BOE Importance: 3/10

Authorization to install energy storage batteries next to Tesouro wind farm in A Coruña

19 Oct 2026 Effective: 19 Oct 2026 5 views
Who is affected:
Enel Green Power España, SL, and renewable energy sector in Galicia

Summary

Enel Green Power España receives permission to build a 17.5 MW battery system hybridized with its Tesouro wind farm in As Pontes (A Coruña).

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Enel Green Power España, SL, prior administrative and construction authorization for the 'Tesouro Storage' battery storage system of 17.5 MW, which will be hybridized with the 50.4 MW Tesouro wind farm in As Pontes de García Rodríguez (A Coruña). The infrastruc…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 29 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Enel Green Power España, SL, autorización administrativa previa y autorización administrativa de construcción de la instalación de almacenamiento por baterías «Tesouro Storage», de 17,5 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con el parque eólico «Tesouro», de 50,4 MW de potencia instalada, en As Pontes de García Rodríguez (A Coruña).

Related regulations

Almost there