Energy BOE Importance: 3/10

Authorization Denied for Tara 23.7 MW Solar Park in Tauste (Zaragoza)

12 Sep 2026 Effective: 12 Sep 2026 8 views
Who is affected:
Project promoter Energía Inagotable de Tara, SL, and the photovoltaic sector in general

Summary

The Ministry denies the Tara solar park in Zaragoza because its electrical grid access permits expired. The project promoter ultimately requested the closure of the proceedings.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines dismisses the application for prior administrative authorization of the Tara photovoltaic park (23.7 MW) in Tauste, Zaragoza, promoted by Energía Inagotable de Tara, SL. The main reason is the expiration of access and connection permits to the transport network at the…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 31 de agosto de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Energía Inagotable de Tara, SL, de autorización administrativa previa del parque solar fotovoltaico «Tara», de 23,7 MW de potencia instalada, en Tauste (Zaragoza), y de su infraestructura de evacuación asociada, en las provincias de Zaragoza, Navarra, La Rioja, Álava y Burgos.