Energy BOE Importance: 4/10

Authorization to inject biomethane into the Gallur-Tauste-Ejea de los Caballeros pipeline in Tauste (Zaragoza)

11 Sep 2026 Effective: 11 Sep 2026 11 views
Who is affected:
Redexis Infraestructuras SL, Tauste Biometano SL and the renewable gas sector in Spain

Summary

The Government authorizes Redexis to connect a biomethane plant to the gas transport pipeline in Tauste, Zaragoza. This allows renewable gas to be introduced into the existing network.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Redexis Infraestructuras, SL, administrative authorization and approval of the execution project to connect a biomethane production plant operated by Tauste Biometano, SL, to the primary transport pipeline Gallur-Tauste-Ejea de los Caballeros. The facilities wi…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 25 de agosto de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Redexis Infraestructuras, SL, autorización administrativa y aprobación del proyecto de ejecución de las instalaciones del proyecto «Proyecto de nueva posición sobre el gasoducto "Gallur-Tauste-Ejea de los Caballeros" para inyección de biometano en Tauste (Zaragoza)».

Related regulations