Energy BOE Importance: 1/10

Correction of errors in the resolution on the abandonment of the Taraguilla wind farm in Cádiz

14 Sep 2026 Effective: 14 Sep 2026 6 views
Who is affected:
Desarrollos Renovables Eólicos y Solares, SLU, and related administrative records

Summary

Numbering errors are corrected in the resolution that accepted the withdrawal of the Taraguilla wind farm of 62.7 MW in Cádiz. It only affects the internal numbering of the document sections.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines rectifies material numbering errors in the resolution of 1 July 2026, by which the withdrawal of Desarrollos Renovables Eólicos y Solares, SLU, regarding the Taraguilla wind farm (62.7 MW, Cádiz) was accepted. The correction, under article 109.2 of Ley 39/2015, reorde…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 18 de agosto de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 1 de julio de 2026, por la que se acepta el desistimiento formulado por Desarrollos Renovables Eólicos y Solares, SLU, de la solicitud de autorización administrativa previa y autorización administrativa de construcción del parque eólico «Taraguilla», de 62,7 MW de potencia instalada, y de su infraestructura de evacuación, en la provincia de Cádiz.

Related regulations