Energy BOE Importance: 2/10

Correction of Elawan Olmedo III solar plant power in Valladolid: from 50 MW to 49.61 MW

29 Aug 2026 Effective: 29 Aug 2026 11 views
Who is affected:
Elawan Energy Olmedo 3 SL and administrations managing access to the electrical grid

Summary

An error in the authorization of the Elawan Olmedo III photovoltaic plant in Valladolid is corrected, adjusting its installed capacity from 50.064 MW to 49.61 MW.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines rectifies the April 2023 resolution that authorized the Elawan Olmedo III solar plant in Ramiro (Valladolid). The error affects the installed capacity figure, which should be 49.61 MW and not 50.064 MW, in accordance with the Fifth Transitional Provision of Real Decre…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 8 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se corrigen errores en la de 20 de abril de 2023, por la que se otorga a Elawan Energy Olmedo 3, SL, autorización administrativa previa para la instalación fotovoltaica «Elawan Olmedo III», de 50,064 MW de potencia instalada, y sus infraestructuras de evacuación, en el término municipal de Ramiro, en la provincia de Valladolid.

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations