Energy BOE Importance: 3/10

Ciudad de Tartessos II solar plant in Huelva cancelled due to incompatibility with Seville-Huelva high-speed rail

22 Aug 2026 Effective: 22 Aug 2026 3 views
Who is affected:
Renewable energy developers and photovoltaic sector in Huelva

Summary

Savanna Power Solar 10 withdraws from building a 60 MW photovoltaic plant in Trigueros (Huelva) as it interferes with the future Seville-Huelva high-speed rail route.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines accepts the withdrawal of Savanna Power Solar 10, SLU, regarding the construction authorization for the Ciudad de Tartessos II photovoltaic plant (60.569 MW) in Trigueros, Huelva. The developer had obtained prior administrative authorization in July 2023 and requested…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 5 de agosto de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Savanna Power Solar 10, SLU, de la solicitud de autorización administrativa de construcción para la instalación fotovoltaica Ciudad de Tartessos II, de 60,569 MW de potencia instalada, y su infraestructura de evacuación, en Trigueros (Huelva).

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations