Energy BOE Importance: 3/10

Authorization to build a 176 MW battery storage system next to the Tagus 2 solar plant in Toledo

16 Oct 2026 10 views
Who is affected:
Khons Sun Power SL project developer and Spain's renewable energy sector

Summary

The Government authorizes Khons Sun Power to build a 176 MW battery system to store energy from its photovoltaic plant in Ocaña and Ontígola (Toledo).

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Khons Sun Power, SL prior administrative and construction authorization for the Tagus 2 HBESS battery storage system (176.44 MW), which will be hybridized with the Tagus 2 photovoltaic plant (224.4 MW) in Toledo. The processing benefited from the environmental …

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 14 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Khons Sun Power, SL, autorización administrativa previa y autorización administrativa de construcción para el proyecto de almacenamiento con baterías Tagus 2 HBESS, de 176,44 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la planta fotovoltaica Tagus 2, de 224,4 MW de potencia instalada, ubicadas en Ocaña y Ontígola (Toledo).

Related regulations