Energy BOE Importance: 3/10

Authorization to add 21.69 MW battery storage system to Bañuela solar plant in Cuenca

17 Aug 2026 28 views
Who is affected:
GR Bañuela Renovables SLU and administrations of Cuenca and Castilla-La Mancha

Summary

GR Bañuela Renovables is authorized to expand its solar plant in Altarejos (Cuenca) with a 21.69 MW battery storage system, creating a hybrid installation with 50 MW total capacity.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants prior administrative and construction authorization to hybridize the FV Bañuela photovoltaic plant (49.7 MW) with a 21.69 MW battery storage module in Altarejos (Cuenca). The resulting installation will have 50 MW of installed capacity and requires new evacuati…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 20 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a GR Bañuela Renovables, SLU, autorización administrativa previa y autorización administrativa de construcción para el módulo de almacenamiento Bañuela, de 21,69 MW, y su infraestructura de evacuación, para su hibridación con la instalación solar fotovoltaica existente «FV Bañuela», de 49,7 MW de potencia instalada, que conforman una instalación híbrida de 50 MW de potencia instalada, en Altarejos (Cuenca).