Energy BOE Importance: 3/10

Authorization to add 21.69 MW battery storage system to Turbón solar plant in Cuenca

17 Aug 2026 Effective: 17 Aug 2026 31 views
Who is affected:
GR Turbón Renovables SLU and renewable energy sector with solar-battery hybridization projects

Summary

The Ministry authorizes GR Turbón Renovables to expand its solar plant in Altarejos (Cuenca) with a 21.69 MW battery storage system, creating a 50 MW hybrid installation.

Detailed analysis PRO

The General Directorate of Energy Policy and Mines grants prior administrative and construction authorization to hybridize the FV Turbón photovoltaic plant (49.7 MW) with a 21.69 MW battery storage module in Altarejos (Cuenca). The resulting installation will have 50 MW of installed capacity and requires new evacuation…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 20 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a GR Turbón Renovables, SLU, autorización administrativa previa y autorización administrativa de construcción para el módulo de almacenamiento Turbón, de 21,69 MW, y su infraestructura de evacuación, para su hibridación con la instalación solar fotovoltaica existente «FV Turbón», de 49,7 MW de potencia instalada, que conforman una instalación híbrida de 50 MW de potencia instalada, en Altarejos (Cuenca).