Energy BOE Importance: 2/10

Withdrawal of application to build the 45 MW Faballones solar plant in Málaga

27 Apr 2026 Effective: 14 Apr 2026 60 views
Who is affected:
Faballones Solar SL development company and potential competitors in the evacuation area

Summary

Faballones Solar company withdraws from its 45 MW photovoltaic plant project in the municipalities of Álora, Pizarra and Cártama in Málaga. The administration formally accepts the abandonment of the file.

Detailed analysis PRO

The Dirección General de Política Energética y Minas accepts the withdrawal of Faballones Solar, SL, regarding its application for prior administrative authorization, construction and declaration of public utility for a 45,095 MW photovoltaic installation in Málaga. The project also included its evacuation infrastructu…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Crear cuenta gratis Ver planes PRO

Full official title

Resolución de 14 de abril de 2026, de la Dirección General de Política Energética y Minas, por la que se acepta el desistimiento formulado por Faballones Solar, SL, de la solicitud de autorización administrativa previa, autorización administrativa de construcción y declaración, en concreto, de utilidad pública, para la instalación fotovoltaica «Faballones», de 45,095 MW de potencia instalada, y su infraestructura de evacuación, en Álora, Pizarra y Cártama (Málaga).