Energy BOE Importance: 3/10

Authorization of Cerezo Solar 52.5 MW solar plant in Madrid with route modifications

01 Aug 2026 Effective: 01 Aug 2026 43 views
Who is affected:
Promoter company Cerezo Solar SLU, municipalities of Torres de la Alameda and Villalbilla (Madrid)

Summary

The Government authorizes modifications to the Cerezo Solar photovoltaic plant in Torres de la Alameda and Villalbilla (Madrid), with 52.5 MW capacity. Routes are adjusted to protect archaeological heritage and infrastructure.

Detailed analysis PRO

The Directorate General for Energy Policy and Mines grants Cerezo Solar, SLU prior administrative and construction authorization for modifications to its 52.5 MW photovoltaic plant in the Community of Madrid. Modifications include displacements of medium voltage underground line sections and 220 kV evacuation infrastru…

PRO exclusive content

Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.

Desbloquear análisis PRO Ver planes y precios

Full official title

Resolución de 15 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Cerezo Solar, SLU, autorización administrativa previa de modificaciones, autorización administrativa de construcción de las modificaciones para la instalación fotovoltaica Cerezo Solar, de 52,5 MW de potencia instalada, y su infraestructura de evacuación, en los términos municipales de Torres de la Alameda y Villalbilla, en la Comunidad de Madrid, y se declara, en concreto, la utilidad pública de las modificaciones.

Sponsored space
Sponsor the Energy category

Your brand in front of thousands of businesses and freelancers tracking the legal changes in your sector.

I want to sponsor it

Related regulations