Authorization of Cerezo Solar 52.5 MW solar plant in Madrid with route modifications
01 Aug 2026Effective: 01 Aug 2026160 views
Who is affected:
Promoter company Cerezo Solar SLU, municipalities of Torres de la Alameda and Villalbilla (Madrid)
Summary
The Government authorizes modifications to the Cerezo Solar photovoltaic plant in Torres de la Alameda and Villalbilla (Madrid), with 52.5 MW capacity. Routes are adjusted to protect archaeological heritage and infrastructure.
Detailed analysis
PRO
The Directorate General for Energy Policy and Mines grants Cerezo Solar, SLU prior administrative and construction authorization for modifications to its 52.5 MW photovoltaic plant in the Community of Madrid. Modifications include displacements of medium voltage underground line sections and 220 kV evacuation infrastru…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 15 de julio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Cerezo Solar, SLU, autorización administrativa previa de modificaciones, autorización administrativa de construcción de las modificaciones para la instalación fotovoltaica Cerezo Solar, de 52,5 MW de potencia instalada, y su infraestructura de evacuación, en los términos municipales de Torres de la Alameda y Villalbilla, en la Comunidad de Madrid, y se declara, en concreto, la utilidad pública de las modificaciones.
The Ministry authorizes Red Eléctrica to expand the Asturian Santa María de Grado substation with a 250 MVA synchronous compensator to strengthen the electricit...
Red Eléctrica de España and electricity system operators in Asturias
I-DE Redes Eléctricas Inteligentes files a challenge before the National Court against the circular setting the financial remuneration of the energy sector for ...
Electricity and natural gas transport and distribution companies regulated by the CNMC
The CNMC establishes the criteria for paying electricity producers who operated during the electrical blackout of April 28-29, 2025. Prices and compensation app...
Electricity producers and consumers, operators of the Spanish electricity system and market
The environmental impact statement for the Cristo Bailones solar park in Membrilla (Ciudad Real) is approved, which will be combined with an already existing wi...
Promoter Parques Eólicos Ciudad Real SL, local administrations of Membrilla and San Carlos del Valle, and renewable energy sector
The Government authorizes Red Eléctrica to expand the Rocamora substation in Alicante with a synchronous compensator to strengthen the electrical grid. Works mu...
Red Eléctrica de España, SAU, and local and regional administrations in the Alicante area
The Government declares the Navabuena Solar photovoltaic plant in Valladolid, with 449 MW of power, to be of public utility. This allows the developer to occupy...