Environmental approval of Cristo Bailones photovoltaic solar park (35 MW) in Ciudad Real, hybridized with existing wind farm
01 Aug 2026Effective: 01 Aug 202643 views
Who is affected:
Promoter Parques Eólicos Ciudad Real SL, local administrations of Membrilla and San Carlos del Valle, and renewable energy sector
Summary
The environmental impact statement for the Cristo Bailones solar park in Membrilla (Ciudad Real) is approved, which will be combined with an already existing wind farm. The project was modified to reduce its surface area by half following environmental requirements.
Detailed analysis
PRO
The Directorate General for Quality and Environmental Assessment issues the environmental impact statement for the Cristo Bailones photovoltaic solar park (35.125 MW) in Membrilla, Ciudad Real, promoted by Parques Eólicos Ciudad Real SL. Following a lengthy processing initiated in 2023, the project underwent substantia…
PRO exclusive content
Implicaciones prácticas, plazos y recomendaciones específicas para tu sector.
Resolución de 14 de julio de 2026, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula declaración de impacto ambiental del proyecto «Parque solar fotovoltaico Cristo Bailones, de 35,125 MW de potencia instalada, para su hibridación con el parque eólico existente, Cristo Bailones, de 42 MW, y para una parte de su infraestructura de evacuación, en la provincia de Ciudad Real.»
The Government authorizes Gestenia Energía to build a 39.6 MW battery system next to its existing solar plant in Seville. The installation will allow better sto...
Gestenia Energía SL and renewable energy sector in Andalusia
The Government authorizes Urso Solar to build a 39.6 MW battery storage system next to its existing solar plant in Utrera. This allows solar energy to be stored...
Promoter company Urso Solar SLU and renewable energy sector in Andalusia
Spain expands the list of permitted refrigerants in refrigeration installations with two new gases. This affects companies in the refrigeration and air conditio...
Installation companies, manufacturers and maintenance providers of industrial refrigeration equipment
The Ministry authorizes Enagás Transporte del Norte to build a measurement station in Bilbao to inject biomethane produced by Metabarri into the natural gas tra...
Enagás Transporte del Norte, biomethane producers and renewable gas energy sector
The Raycore model of X-ray generating equipment is officially approved for package inspection. The authorization includes technical requirements for radiologica...
Procesos Cano SL company, importers and users of X-ray equipment for inspection
Naturgy Renovables withdraws its application to build a 39 MW photovoltaic plant and 20 MW battery in Valladolid. The Ministry accepts the withdrawal and closes...
Naturgy Renovables SLU and photovoltaic project developers in state processing